Eliminating microcystin in an Ohio water treatment plant

PROJECT OVERVIEW OWNER City of Marysville CAPACITY 1.4 BG of raw water capacity 4.3 MG WTP capacity 2.7 MGD average daily flow to WTP PROCESS Conventional Lime Softening ENGINEER Arcadis APPLICATION Pre-treatment of algae in feed reservoir START DATE Spring 2018 KEY...

Geosmin reduction by algaecide application

TweetLinkedInShare Geosmin reduction by algaecide application to drinking water: field scale efficacy and mechanistic insights Heliyon 7 (2021) e07706. Republished with permission. Download PDF. Authors David Hammond a,*, Anthony Murri b, Sergey Mastitsky c, Ziming...

South Texas water treatment plant saves $3,500 per day

  Algae Control and Taste and Odor Reduction – Water Treatment Plant – South Texas When a south Texas water treatment plant became overwhelmed by algae and the taste and odor problems associated with contamination, they turned to Earth Science Laboratories (ESL)....

Tulsa taste and odor control

Taste and Odor Resolution – Water Treatment Plant – Tulsa, OK Discover more ways EarthTec can help!Fast, effective cyanotoxin solution Taste and odor...